Skip to content
Office, Monday – Friday: 7 a.m. – 5 p.m.Business registration · MD Registration 000000VerifyGeneral liability insurance, $1M per occurrence, $2M aggregateWorkers' compensation insurance
2 more licenses
  • Business registration · MD Registration 000000Verify
  • General liability insurance, $1M per occurrence, $2M aggregate
  • Workers' compensation insurance
Night line(410) 555-0104

Common-area cleaning

Day porter

One person in the building on weekdays, so the lobby and halls stay clean between the night crew's visits.

A day porter works from a short list the manager sets, and the shift is written in the log with the same checks as the night crew's.

On a typical shift

  • Touch-up the lobby, mailroom and elevators

  • Wipe handrails, door handles and buttons

  • Respond to spills and wet floors in common areas

  • Make trash rounds and replace liners

  • Check the trash room and stair halls

  • Write the shift in the log with the times

A cleaner in a cap, mask and gloves wiping a stair railing with a spray bottle

How a visit goes

A visit, in order

  1. 01

    Step 1: Start with the list

    The porter reads the manager's notes and the zone sheet.

  2. 02

    Step 2: Rounds

    Lobby, mail, elevators and halls are checked on a set loop.

  3. 03

    Step 3: Spills as they come

    A spill reported at the desk or by phone goes to the top of the list.

  4. 04

    Step 4: The shift is logged

    Times and tasks go in the log, and the supervisor signs it.

Limits and access

What is extra, what we leave out, and what we need

  • Billed as an extra

    • Weekend or holiday shifts

    • Shifts longer than eight hours

    • Set-up for resident events

  • Not part of this service

    • Security, concierge or front-desk duties

    • Resident requests inside apartments

    • Maintenance repairs

  • What we need from the building

    • A shift length and days, from four to eight hours

    • A place to keep the porter's cart

    • A named contact in the building

Questions

Three questions about this service

Is a day porter part of the plans?

No. A day porter is quoted separately, by shift length and days, after the walk-through.

Can the porter let in vendors?

Not by default. If you want it, we write the rule in the building file, with who may be let in and who signs.

What if the porter is out?

The supervisor sends a replacement or calls the manager before the shift starts, and the log notes it.

Does the building need someone on days?

Walk the building with us and we write the porter's list and shift.